![]() ![]() OK ! The software said back up complete.Ītention !, for open the hardware in the project of S7 is necessary install the toolbox for 810d/840d /840di in the step 7 library, the tool box must be the same version of pcmcia card in the case of 840d, it's not absolut necessary for make upload but you can install tool box> =of pcmcia version, may be version 6.5, only apply setup and the tool box install alone, then you can see or open the hardware of the project upload of step7, if the toolbox not installated you can not open the hardware in the step 7 project!! OKK, you understand? It's necessary the tool box for open the hardware ! this valid for 801d/840d/840dI. ![]() I'm working for a very long time with 810d/840d/840di/, i don't know if i'm a teacher but i study very much and a lot of people talk with me.ġ) for make the backup (up-load the program) with s7 v5.3, the comunication in the pg-pc (notebook) (s7)interface must be in 187 kby, rack=o, mpi =2, you need open a new project, insert s7-300 station and then "upload station ", afther this you ( wait a 5 or 10 minutes) have a backup of plc program without of comentary.
0 Comments
Leave a Reply. |